Fire Safety Defect Reports in NSW: A Guide for Strata Managers

Receiving a fire safety defect report is only the beginning of the rectification process. Someone still needs to establish which faults require urgent attention, obtain quotations, arrange access, organise repairs and confirm that the defects have been resolved.
For strata managers responsible for multiple properties, the difficulty is often keeping track of what remains outstanding, particularly when several contractors are involved.
This guide explains how to review fire safety defect reports, organise rectification works and maintain the records needed for ongoing fire safety compliance in NSW.
What to do when you receive a fire safety defect report
Start by identifying any defects that affect the operation of essential fire safety measures. Contact your fire safety contractor immediately if a critical defect has been reported and seek advice on the appropriate response and any interim safety arrangements.
For the remaining findings, establish which repairs are required, whether further investigation is necessary and who will be responsible for organising the work.
Before forwarding a quotation to the strata committee, check that the proposed works correspond to the findings in the inspection report.

Keep outstanding inspections separate from confirmed defects. An item that could not be inspected should remain open until the required assessment has taken place.
Critical defects, non-critical defects and non-conformances under AS 1851
Since 13 February 2026, NSW building owners have been required to follow AS 1851-2012 routine servicing procedures for applicable essential fire safety measures, subject to the relevant regulatory provisions.
Building Commission NSW distinguishes between three categories of adverse inspection findings.
Classification | Meaning | Recommended management response |
Critical defect | A fault that prevents the system from operating | Escalate immediately and arrange prompt rectification and appropriate interim safety measures |
Non-critical defect | A fault that does not critically impair system operation | Establish a rectification plan based on technical advice |
Non-conformance | Missing or incorrect information that does not affect system operation | Investigate and determine how the issue can reasonably be addressed |
A critical defect could involve a sprinkler system that is unable to receive its required water supply. Missing baseline documentation, on the other hand, may be recorded as a non-conformance or a non-critical defect, depending on the circumstances.
The classification should be determined by a suitably competent professional. Strata managers should not independently downgrade a defect to accommodate a maintenance budget or committee meeting schedule.
What should a fire safety defect report include?
A useful report gives the person organising repairs enough information to identify the affected equipment, understand the problem and obtain an appropriate quotation.
Consider these two hypothetical descriptions of a fire door defect.
Example 1:
Fire door defective. Repairs required.
Example 2:
Level 3 east stairwell. Fire door FD-03-02 fails to latch during a closing test. Further assessment of the door closer, latch and alignment required. Photographs attached.

The second description identifies the door, describes the observed fault and gives the repair contractor a starting point for further assessment.
When reviewing a report, look for the following information:
Building address, inspection date and contractor details.
Location and identification of the affected asset.
Description of the observed defect or failed test.
Technical classification of the defect, where applicable.
Relevant measurements, test results or photographs.
Recommended rectification or further investigation.
Advice on urgency and operational implications.
Any limitations affecting the inspection.
Photographs are particularly useful when several similar assets are installed throughout a building. A photograph alone, however, may not establish whether equipment meets its required performance standard.
For examples of common faults affecting fire-rated doors, see our guide to five fire door defects found in NSW buildings.
Check whether every required inspection was completed
A report with relatively few defects does not necessarily mean that the entire building was inspected successfully.
In strata properties, access restrictions can prevent technicians from inspecting apartment entrance doors, locked plant rooms, service cupboards and equipment located within commercial tenancies.
Check whether the report identifies:
Assets inspected and found satisfactory.
Assets inspected and found defective.
Assets that could not be accessed.
Tests that could not be completed.
Areas requiring a return visit.
For example, if eight apartment entrance doors could not be accessed during a scheduled inspection, those eight doors should remain outstanding inspection items. They should not be recorded as satisfactory simply because no defects were reported against them.
Arrange the necessary access and follow up with the contractor to complete the inspection.
This is particularly important when preparing for an Annual Fire Safety Statement or changing fire safety maintenance providers.
How to compare fire safety defect rectification quotations
Two contractors may receive the same defect report and submit substantially different quotations.
Before comparing the total price, establish whether they are proposing the same scope of work.
Item to compare | What to check |
Defects included | Does the quotation address every relevant defect reference? |
Repair or replacement | Is replacement justified where a repair may be suitable? |
Access requirements | Are access equipment and additional visits included? |
Testing | Does the scope include appropriate testing after repairs? |
Documentation | What completion records will be provided? |
Exclusions | Which items remain outside the quoted scope? |
Ask contractors to include the original defect reference numbers against the proposed repair items. This allows the strata committee to see which findings will be resolved by approving the quotation.
Where replacement or an upgrade is recommended, ask for the technical basis for the proposed work.
AS 1851-2012 is a routine servicing standard. Its introduction does not, by itself, require existing fire protection systems to be upgraded. However, defects, existing performance requirements or other regulatory obligations may make additional work necessary.
Our guide to questions to ask a fire safety contractor in Sydney covers other considerations when selecting a maintenance provider.
Who is responsible for arranging fire safety defect repairs?
In NSW strata buildings, the owners corporation generally has responsibility for maintaining and repairing common property.
A strata manager may coordinate maintenance, obtain quotations, communicate with residents and organise contractor access within the authority delegated to them.
The strata committee may be involved in approving expenditure and managing the maintenance budget. The fire safety contractor provides the technical assessment and carries out work within their area of competency.
These responsibilities should be clear before a defect is left waiting for approval.
If a critical defect affects a fire protection system, the building's response should be guided by the safety implications and applicable obligations. Seek immediate professional advice rather than waiting for the next routine committee meeting.
For broader information about owners corporation responsibilities, read our NSW strata fire safety compliance guide and the NSW Government guidance on safety rules for strata common property.
Use a fire safety defect register to track outstanding repairs
A separate defect register can help strata managers coordinate work across several contractors and inspection cycles.
The register does not need to be complicated. A spreadsheet with consistent asset and defect references can be sufficient for management purposes.
An example entry might contain:
Field | Example entry |
Defect reference | FD-014 |
Asset location | Level 3 east stairwell |
Reported fault | Fire door fails to latch |
Classification | As assessed by the contractor |
Required action | Investigate and rectify |
Responsible contractor | Fire door contractor |
Target completion date | Based on technical advice |
Current status | Awaiting rectification |
Completion evidence | Repair report and test result |
This is an illustrative management record rather than a prescribed regulatory template.
For a building with several outstanding defects, useful status categories include awaiting quotation, awaiting approval, access required, work scheduled, awaiting verification and closed.
A management register supplements the building's formal servicing records. It does not replace the physical on-site logbook required under AS 1851-2012.
NSW Government guidance also specifies that applicable servicing records must be retained for at least seven years.
How to verify that a fire safety defect has been rectified
A completed work order or paid invoice records a commercial transaction. It may not contain enough technical information to establish that the original fault has been resolved.
Request completion documentation that identifies:
The original defect and affected asset.
The repair or replacement work undertaken.
The date the work was completed.
The outcome of appropriate post-repair testing.
Any remaining defects or restrictions.
Additional assessment or certification, where required.
For a fire door that previously failed to latch, the relevant completion record should establish whether the door now operates as required following rectification and appropriate testing.
If the contractor completes only part of the approved scope, the remaining items should stay open in the defect register.

Where the required evidence is not yet available, mark the item as awaiting verification rather than closed.
This provides a useful record for future servicing, changes of contractor and annual fire safety assessments.
Can outstanding fire safety defects prevent an AFSS from being issued?
They can, depending on the nature of the defects and their effect on the relevant fire safety measures.
Routine servicing under AS 1851-2012 and assessment for an Annual Fire Safety Statement (AFSS) are separate processes.
An outstanding non-critical defect or non-conformance does not automatically prevent an AFSS from being completed. The accredited practitioner must establish whether the relevant fire safety measure meets its required performance standard.
Before the annual assessment, make the following documents available to the practitioner:
Current Fire Safety Schedule.
Previous AFSS.
Recent inspection and service reports.
Outstanding defect and access information.
Completed rectification records.
Other relevant technical documentation.
If the owner becomes aware that unresolved defects may delay the AFSS, Building Commission NSW advises contacting the relevant council promptly.
Our AFSS compliance guide for NSW building owners explains the wider annual assessment and lodgement process.
Frequently asked questions
How long do strata buildings have to rectify fire safety defects?
There is no single rectification period that applies to every defect. The appropriate response depends on the classification, the affected system, technical advice and any applicable regulatory requirements or council orders.
Critical defects require urgent attention. Other findings should be managed through an appropriate rectification plan.
Do all non-critical defects need to be repaired immediately?
No. NSW Government guidance confirms that the introduction of mandatory AS 1851-2012 servicing does not require every non-critical defect or non-conformance to be resolved immediately.
Building owners should still address these findings appropriately. A non-critical defect may deteriorate or affect system performance over time.
Does missing baseline data mean that a fire safety system has failed?
Not necessarily. Missing baseline information may be recorded as a non-conformance or a non-critical defect.
The appropriate classification and any necessary investigation depend on the affected system and the information required for its assessment.
Can another contractor repair defects identified during an inspection?
Generally, a building owner can engage another suitably qualified contractor to undertake rectification, subject to the relevant licensing, competency and regulatory requirements.
Provide the repair contractor with the original defect report, relevant technical information and asset references. Arrange appropriate verification after the work is completed.
Can a digital defect register replace the AS 1851 logbook?
No. Electronic reporting and defect tracking can support building management, but current NSW Government guidance requires the physical servicing logbook to remain on site.
Fire safety inspections and defect rectification in Sydney
EverSure Fire Protection works with strata managers, owners corporations, commercial property owners and building managers across Greater Sydney.
Our services include fire safety testing and inspections, fire protection system maintenance and repairs and AFSS assessment and compliance support.
Our technicians use digital reporting through AroFlo to record inspection results, prepare service reports, generate repair tasks and provide quotations. Clients can also access service history and relevant documentation.
If you have received a fire safety defect report and need assistance with outstanding repairs, send us the report, your building details and any available fire safety documentation.
We can discuss the reported findings and determine what further assessment or rectification services may be required.
Disclaimer: This article provides general information about fire safety defect reports, maintenance and rectification in NSW. It does not constitute legal advice or a technical assessment of an individual building. Applicable requirements depend on the building's Fire Safety Schedule, relevant standards, system design and regulatory obligations.



Comments